MASCO Catalog: Concrete Forming & Accessories

41 MASONS SUPPLY COMPANY Oregon (800) 537-3407 ♦ Washington (800) 537-6216 Clackamas | Eugene | West Eugene | Hillsboro | Medford | Portland | Salem | Ridgefield | Seattle | Tacoma | Woodinville M A S C O . N E T - Place a Jack Leg on the ground. - Measure the Screw Jack extension. - Mark the leg 15" from the Iflon washer (to locate frame). - Attach the frame to the top slot on the Jack Leg. - Fasten the middle frame wing nut snug, but not too tight. - Check the frame location against the mark on the leg. - Fasten the other two frame wing nuts, then tighten all three. - Rotate the leg attached frame to lay flat on the ground. - Take the second leg and measure the Screw Jack extension. - Mark the leg 15" from the Iflon washer. - Attach the frame to the second leg as in Step 1. - Attach two Frames (one to each leg) so that the Frames are vertical. STEP 1 STEP 2 STEP 3 HORIZ. FORMING & SHORING MEGA SHORE

RkJQdWJsaXNoZXIy MTIxNDc=